QENSAI / Operations

Snapshot view adds an even frame and hides the scrollbar. Press S to restore controls; F toggles full screen.

Our attended system walkthrough

TAG RelayFrom scope to proof.

The steps we’ll follow, what’s done so far, and what will finish each step.

Current work · 7 October 2026

Use the conversation to build the process.

The presentation follows the existing Operations journey, the Relay exchange and the Response Table. We use those records to establish unwired protocols, sequence governed work and review what returns. The engineering findings stay in the existing backlog; direct agent code repair is outside this session’s scope.

  1. Start with the operation. Open Operations Home and the accepted integration SPOC. Show the purpose, governing references and saved thread.
  2. Review the shared work record. Open the existing integration Response Table. Read the context, current and previous answers and linked To-Dos before drafting the next exchange. Resolve questions from canon before asking the human.
  3. Continue the Relay exchange. Carry the same topic, thread and task references. Obtain and attach the Front Porch / Porch Pass in the sending browser before any Relay Desk compose send. Opening TAG Relay for review does not send or dispatch work.
  4. Review the return. Return to the same Response Table. Keep draft, staged, sent, delivered and accepted states distinct. Save supported changes through the existing record and verify their readback; unresolved work remains open.

Story and captures: mobile introduction first: purpose → existing context → prescribed thread → governed exchange → inspectable return → governed improvement. Then move to wider application detail. The operator takes the screenshots. Describe the self-building process as the intended governed workflow; show actual recorded outcomes separately.

Backlog totals have not been counted here. Existing engineering work is preserved, and this walkthrough does not claim fresh task execution or automatic protocol installation.

Recorded exchange · 7 October 2026

Correction returned. Review preserves the limits.

The first verified Ollama Local / llama3.2 reply on TAG thread 8233dbe9 was request FR 298031 → response FR 298032. The returned wording invented terminology and missed the requested presentation beats. It is preserved as evidence and rejected for presentation guidance.

Latest correction: request FR 298079 → reply FR 298080 returned all six supplied presentation beats through Ollama Local, with one turn and forwarding off. The attended review is saved in the same SPOC and visible in the Response Table. The reply omitted the requested evidence sentence and labeled itself PROCESSING; its status does not prove task execution. Use the six supplied beats as an editorial draft with this caption: Supplied context only; dialogue transport demonstrated; no independent file/database access or actions claimed.

  1. Open the actual reply in TAG Relay. Select the original thread beginning 8233dbe9, then inspect the recorded request and reply. Review the existing exchange without sending another message.
  2. Open the integration Response Table. Expand Decision context. Its Current system state and Evidence summary show the attended review saved on the existing SPOC.
  3. Tell the evidence story. The reply proves dialogue transport. The summary proves attended reconciliation. The raw dialogue did not automatically become a Response Table answer or a saved SPOC-discussion reply.

Discussion return remains open.

The attended review is saved in the existing SPOC context and visible in this Response Table. The integration request arrived through ClaudeDesk’s assembly channel. The current TAG discussion-reply route accepts TAG Relay requests, so it cannot save a discussion reply for this request. That connection remains governed follow-up; the walkthrough does not claim a saved discussion return.

The recorded TAG exchange uses thread 8233dbe9. The integration request’s separate discussion thread begins 25dae9b7. Keep those references together without treating them as the same thread.

The earlier supervised approval was recorded, but forwarding failed (FR 298028/298029). Preserve that attempt alongside the successful local retry. This exchange does not prove Gate Zero, JBD issuance, task completion or autonomous installation.

Earlier engineering checkpoints — retained history

These dated repair investigations remain evidence and backlog context. The active session is presentation and governed communication.

Current operation · source and record review · 6 October 2026

Finish the original task path.

The thread is saved and the NTF-23 identity choice is accepted. Complete invocation acceptance, then identity and governance migration; bind the actual DDS/DDT prescription; enforce it at normal preflight and primary processing; finish the existing routing and dependency before one bounded worker turn and its accepted return.

Scope correction: prior-state storage and the band emitter are separate pressure-proof work. Their pending review does not add a prerequisite to this task. Current health, authority, required gates and evidence still apply.

Worker readiness: the selected Ollama Local route uses the existing local Relay on port 3100. It refused connections at 09:46 UTC; native Ollama alone does not satisfy that route. No service or worker was started.

Source repaired · acceptance narrowed · 6 October 2026

Two defects repaired; finish the real checks.

Done: reviewed source now preserves accountable invocation refusals for thrown values and advances the real stored flow version. Source checks pass; live activation and acceptance remain open.

Already settled: NTF-23 applies to this thread, failed required checks stop traversal, and the task needs both seals. The missing prescription is the actual DDS and ordered DDT linked to this TAG scope version; the current composer drops supplied DDS bindings.

Next: finish the existing invocation acceptance catalog, author that prescription/version association and enforce its outcomes, then complete routing and selected Relay readiness before one attended local turn and its accepted Response Table return.

Relay: at 09:46 UTC, port 3100 refused and Docker was down. The old startup also starts other assemblies and a conversation watcher. Reconcile the actual service footprint before restoring it.

Version capture repaired · 6 October 2026

Keep the proposed checks when a version is edited.

Done in source: Operations now preserves the saved checks through edit, reorder and save. The API keeps them in the saved version and refuses a guarded snapshot before creating a flow. Review and source checks pass; live activation is still unverified.

Next: admit the actual TAG checks, their callable identities and ordered prescription on the existing integration. A known check name alone does not authorize it for a step. Then finish invocation acceptance, required Gate Zero outcomes, routing and Relay readiness before the attended turn and its Response Table return.

Ordinary page-only versions retain their existing path. A failed provenance stamp now reports failure and identifies any partial flow already created.

Checks mapped · two source corrections · 6 October 2026

Connect each required check to the task.

Done in source: Stage no longer offers a preflight bypass. The dual-seal check refuses missing task identities. Three attended reviews mapped the checks, the functions that perform them and the phase in which they belong. Independent checks and source regressions pass; API activation is still unverified.

Next: finish invocation acceptance, reconcile the specific function bindings, then save the required checks and their ordered version on this thread. Make a failed check stop the worker and require the actual answer and both seals before accepting its return.

The review uses the existing integration. NTF-23, required failure stops and both seals are already settled. The missing work is the exact binding and enforcement.

Invocation acceptance · 6 October 2026

Evidence must follow the actual task.

The invocation source now carries explicit task and journal IDs when its caller supplies them. It refuses unreadable correlation before the function runs. The change passed 104 regression tests and 29 independent review cases; live activation remains open.

The next proof joins the CRS and scope checks to verified authority, then checks epoch and replay, the durable reconciliation queue, independent ledger evidence and the separate reader. The test packet uses the existing records. It does not treat historical receipts or proposed bindings as an executed task.

CRS and scope admission · 6 October 2026

Confirm the authority before the task runs.

Three attended reviews traced the confirmation and scope checks to their existing records. We fixed a source defect that could report a Function Table update while writing a store its reader does not use. All 28 regression tests and 24 independent guard controls passed; live activation remains open.

Next, the existing SPOC must bind a complete confirmation and recovery window, the authenticated caller and operational scope, and the owner-verified Function Table identity correction. The Function Table safeguard is staged, and the plan for these remaining bindings is prepared. These bindings remain unaccepted, so the walkthrough does not claim that a task has run.

Confirmation evidence · 6 October 2026

Check the evidence before recovery.

The source repair prevents an incomplete or ambiguous history window, an invalid score, a failed evidence write or a changed configuration from starting recovery actions. It preserves valid drift records. All 140 regression tests and the two independent source reviews passed; live activation remains open.

Next, we must verify that the latest measurement and its history share the accepted configuration and source epoch, then establish sustained confirmation and recovery. The authenticated caller, operational scope and Function Table binding remain part of that review on the existing SPOC.

Current operation · 6 October 2026

Back on the original TAG path.

Fixed in source and locally active: the history writer keeps its exact acknowledged row in a private receipt beside the used configuration. The drift writer refuses a missing or different event ID. Applied-function controls passed 39 and 12 cases; an independent review passed 39 and 10. These repairs improve evidence quality.

Scheduling correction: the separate score-to-event, cohort and confirmed-recovery commissioning work is adjacent. It becomes a prerequisite only when an accepted applicable prescription or an actual gate failure requires it. The original TAG proof still requires its real health, caller, witness and token checks.

Already done: the thread is saved and attached; NTF-23 and the graded integration are accepted; replay keeps its outcome, both primary callers retain the seal’s task identity, and the owner-saved prompt is consistent. The selected local Relay-to-Ollama path has a reachability receipt.

Caller identity is now carried in source: the real authenticated caller stays with the request through the compute, promotion and Relay paths. It cannot be supplied by the task text or retained by work that outlives the request. The repair passed 45 controls and 251 regression tests; independent review also passed. The API has not been restarted for this change.

Next evidence: read the three selected scope records through the normal owner session, then match their accepted permissions to the registered caller. An existing DDS allocation was found for a different capability. The machine reader cannot access these records, so their contents remain unknown. The health and scope checks are prepared; their complete integration and acceptance remain open.

  1. Finish governed function invocation. Replace the health and scope placeholders with actual checks, prove full Pass 1A, then finish the identity and governance migrations in order.
  2. Make this thread’s prescription enforce execution. Bind its actual immutable DDS/DDT version and required steps; enforce refusal in preflight and both primary paths.
  3. Complete the route and one worker return. Finish the existing routing prerequisite and native dependency, promote the original child from Stage, then verify its JBD token, real outcome, seals and accepted Response Table return.

First preflight uses the staged request, thread, scope and caller before promotion or token issuance. The later worker task has its own ID. Earlier progress sections below are historical; this checklist defines the current sequence.

Particular bindings prepared · 6 October 2026

Review the evidence the checks will use.

Two attended reviews have prepared the exact measurement and recovery proposal, and the scope and owner proposal. The existing SPOC links the field matrices and the review procedure. BDD reviews the specification; OQS implements the accepted assignment.

The immediate invocation proof uses the migrated reduction scopes. The remaining inventory is deferred until an actual call needs it. The pressure-store and band-emitter reviews keep their separate scope; their answers do not authorize this task or correct the Function Table.

Next: review the particular fields on the existing form, verify the owner-controlled writer and caller correspondence, then finish invocation acceptance and this thread’s prescribed checks. Preparation and source checks do not establish live authority or an executed task.

The binding-review report is filed and journaled. The proposed fields are ready for BDD review on the existing SPOC.

Open the current six-checkpoint finish checklist →

Implementation sequence · 6 October 2026

One window. Verified recovery. An authorized caller.

The code now retains the exact calculated history row for inspection without causing a write. Its measured time, components and configuration stay together. The source controls passed; live admission is still open.

Both source reports are now filed and journaled. Next is the owner review of the existing measurement, recovery and scope bindings.

  1. Accept the existing bindings. Record the actual measurement population, recovery recipe, scope records and trusted caller on the existing SPOC.
  2. Build and prove the common window. Use the acknowledged current measurement plus the configured earlier members for the score, trend and confirmation fraction. Verify sustained recovery through the existing Restore cycle.
  3. Verify scope, then complete the journey. Resolve the owner-controlled scope and Function Table bindings before invocation acceptance, the TAG prescription, normal preflight and the bounded local turn.

The original thread, routing prerequisite and same-child Response Table return remain the work record. Source preparation, accepted authority and execution each need their own evidence.

The thread records our sequence

Task scope → routing node → assembly → worker

Task scope
Routing node
Assembly
Worker
Accepted results return to the same governing record and Response Table.

Response Table / shared work record

Keep the conversation tied to the work.

The Response Table brings decision context, agent answers, operator rulings and associated SPOC To-Dos into one view. Use it before the task, through the Relay exchange and when reviewing the return.

Before the task

Review the governing context, current and previous answers, and open To-Dos. Reuse the existing topic and integration records.

Through the Relay

Keep requests and answers tied to the same topic, thread and task. Record open questions and operator rulings in the table; posting or sending is a deliberate action.

After the return

Inspect the result and evidence, reconcile supported To-Do changes, and verify saved changes on the linked SPOC. Keep unanswered decisions and incomplete work open.

Done so far: both existing tables are linked and available. The accepted result for this child is still pending; a worker reply does not automatically update the Response Table.

Use step 2 to review the record and step 12 to reconcile the outcome. These links open the saved tables in this browser; opening them sends nothing.

Reading step 1 / 12 Discover

Open Governance Search →

01

Discover Governance Search

Find applicable NTFs

Reviewed
Done so far

The canonical instructions, indexes, glossaries and related 2VPs have been investigated. The existing thread and governance scopes were found.

Next action and completion evidence

What we’ll do

Keep the applicable rules and required reads with this task as the walkthrough continues.

What will finish this step

Trace the selected measures to their registered functions, 2VPs and governing instructions.

Story line Begin with the rules and the existing context.

02

Discover 2VP Workbench

Review existing SPOC and context

Accepted for integration
Done so far

The corrected integration SPOC passes saved readiness: nine required functions, three graders, zero gaps. The operator accepts the graded form and selects existing NTF-23 for prescription validation. The ruling is saved and reloaded.

Next action and completion evidence

What we’ll do

Follow the canonical invocation migration order and resolve the existing DDS/DDT prescription and routing prerequisites. Keep the application child staged. In the Response Table, review the decision context, current and previous answers and associated SPOC To-Dos before planning the next task.

What will finish this step

Grade PASS at 04:21:01 UTC on 5 October; human ruling saved at 04:29:12 UTC. This accepts the integration scope; it does not establish execution readiness.

Story line The governing form and identity choice are accepted.

03

Discover 2VP Console

Resolve measures on Board

Partial
Done so far

Registered function references and measures have been found. Operations Home already has a scope-version-to-DDT path and three saved Governance & Compliance snapshots. Their different sequence and empty bindings do not prescribe this TAG thread.

Next action and completion evidence

What we’ll do

Resolve this thread’s exact governing DDS/DDT measures and supported identities. Reuse the existing prescription scopes and version path.

What will finish this step

Accepted function → FR-ID → 2VP → instruction correspondence, with the required DDS/DDT bindings. Existing DDT-shaped records are not acceptance of this prescription.

Story line A measure must refer to an actual governing rule.

04

Compose 2VP Console

Compose or reuse the thread

Recorded
Done so far

A nine-measure thread is saved. Its OBSERVE settings persist; it has zero runs. Saving its order has not established preflight enforcement.

Next action and completion evidence

What we’ll do

Accept the prescribed sequence and binding requirements. Keep observation and primary execution checks distinct.

What will finish this step

The saved sequence and modes match the reviewed prescription. An observed flow or side-lane halt alone cannot certify primary enforcement.

Story line The thread records the process we intend to follow.

05

Compose Stage

Identify the staged task

Verified
Done so far

The existing application child 00ebba45 is staged. The topology prerequisite 069d7374 is also staged. No duplicate task is needed.

Next action and completion evidence

What we’ll do

Keep the child, its prerequisite and its parent lineage tied to this same work. Review the exact request before any action.

What will finish this step

The correct request ID, topic and parent relationship remain intact. A1 and SPOC records are not promoted.

Story line Submission creates staged work; it does not authorize execution.

06

Compose Gate0 Studio

Attach the composed thread

Verified
Done so far

The saved governance flow is attached to the exact staged child. Attachment and saved OBSERVE modes have been read back.

Next action and completion evidence

What we’ll do

Preserve that attachment while the prescription and routing gaps are resolved.

What will finish this step

The child references the reviewed flow. The staged request ID, tracking thread ID and flow ID remain distinct.

Story line This task now points to its recorded process.

07

Compose TAG Relay

Reconcile TAG Relay context

Open
Done so far

The context and return path are traced. Both routing readers can use the existing topology editor; the accepted scope → node → assembly map is still missing.

Next action and completion evidence

What we’ll do

Complete the existing twelve-scope topology prerequisite, including authority/thread linkage and both entry routes. Reconcile the native task dependency. Carry the same topic and request references into the Response Table so an agent answer stays tied to the work it answers.

What will finish this step

The saved topology is consumed by both readers and maps this task to registered nodes and assemblies. An annotation alone does not enforce a dependency.

Before a Relay Desk compose send, obtain and attach a valid Front Porch / Porch Pass in that browser. Opening or reviewing the desk does not send a message.

Story line Now we prove where this task goes and who can do the work.

08

Authorize Stage

Review and authorize promotion

Blocked
Done so far

The bounded reducer inventory is migrated: 58 static API sites, with whole outputs and dependency order preserved; 280 relevant tests passed at that checkpoint. History readers now disclose failures. The latest projection repair selects a coherent recent CRS window and exposes sample times; 34 new cases, 46 relevant tests and required prebuild guards pass. These are source checks. Local reader activation is verified; confirmed recovery and full invocation acceptance remain unverified.

Next action and completion evidence

What we’ll do

Review the mapped prior-state and score-band contracts on the existing pressure tasks. Prove their correlated transitions and restoration, then admit complete measurements, sustained recovery and independent token checks. Complete the shared invocation, thread prescription and routing before promotion.

What will finish this step

Required: missing or contradictory prescriptions refuse with correlated evidence. The diagnostic runner’s three expected failures reproduce the gap; they do not certify enforcement. Fourteen separate offline JBD authority checks pass. Isolated source checks do not prove a live token or queue receipt; Pass 1A remains unaccepted. The owner-opened history catalog is verified: fourteen columns, measured_at/created_at present, recorded_at absent. The chart timestamp correction is source STAGED; two new regressions and all 48 focused tests pass. Local reader activation is verified; current recovery remains unverified.

Story line The proof exposed the check we still need to connect.

Review pressure recovery and existing tasks

09

Prove Live bot tasks

Inspect receipt and process authorized work

Waiting
Done so far

The free default resolves to Ollama Local, sequential, one turn, through the existing relay on port 3100. The current child has not been promoted or executed.

Next action and completion evidence

What we’ll do

After acceptance and authorization, inspect its actual Gate Zero receipt and process one bounded local turn. Keep paid fallback and standing workers out of this run.

What will finish this step

The exact child, issued token, accepted route, selected worker and dispatch are correlated. Do not reset or re-tokenize the held parent.

Story line Only accepted work reaches the worker.

10

Prove Flight Recorder

Verify result and audit evidence

Waiting
Done so far

The held parent has a real Ollama reply recorded. Its later routing and completeness checks held it; there is no accepted result for the current child.

Next action and completion evidence

What we’ll do

Verify the new child’s actual response, gate outcomes, durable result and terminal completion. Inspect the evidence rather than assuming a fixed event count.

What will finish this step

A saved accepted result and TASK_COMPLETED for this child, followed by actual RESPONSE_PAIRED readback. A reply alone is not completion.

Story line We prove the result, not just that a message came back.

11

Prove Task Lineage

Verify lineage and gate outcomes

Partial
Done so far

Child, prerequisite, parent, tracking thread and saved flow identities are known. The current flow has no runs and the child has no execution events.

Next action and completion evidence

What we’ll do

Trace the authorized run’s parent/child lineage, execution DDT and applicable gate outcomes without overwriting earlier failures.

What will finish this step

One coherent identity chain connects intake, task, token, route, worker, DDT and result. Preserve applicable seals and earlier evidence.

Story line The evidence must belong to the same task.

12

Close 2VP Workbench

Reconcile the same SPOC and RT

Partial
Done so far

The reducer migration and this projection-reader checkpoint are saved on the same integration. Both selected requests remain staged, the flow has zero runs, and the original three actions, prior report and Response Table answers are preserved. The human supplies screenshots; OQS supplies the code, guide and summaries.

Next action and completion evidence

What we’ll do

Complete the three implementation actions and accepted routing, then reconcile the same-child result and stored decision through the governed path. The earlier consolidated investigation report remains separately unclosed. Open the integration Response Table to review the return beside its request, preserve earlier answers and verify any supported To-Do change against the saved SPOC. Retain unresolved decisions as open.

What will finish this step

Earlier source-report closures are verified. The projection-reader report closure is also verified. Reporting closure does not establish activation or accepted execution. The accepted thread, Gate Zero/JBD evidence and same-child return still need their live proof.

Story line The proof findings return to the record that governed them.

Installed locally · verified 5 October 2026

The repaired readers are active.

The CRS chart now returns stored measurements and declares their measurement-time source. Drift Projection identifies the history it uses and its sample window. Both selected tasks remain staged; the saved flow has zero runs.

Evidence still required: the newest stored measurement is from 3 October. The separate drift stream does not supply the missing recovery lineage. Forecast configuration and its token consumer still require their existing correspondence review. Reader activation does not establish confirmed recovery, guard acceptance or a task run.

Next: accept the producer, sampling and parameter revision, retained constraint and sustained recovery evidence before admitting the read-only invocation guard.

Investigation complete · implementation planned

What still separates this thread from a proved run?

Done: the readers are active. The measurement, forecast, recovery and token contracts have been traced through existing guides and records. Ten isolated checks reproduced the contract gaps; no live token or task changed.

Next, in order:

  1. Trace each measurement. Establish its producer, time, rule revision and acknowledged history.
  2. Align the forecast. Make the governed boundaries and their consumers agree. A prediction remains a prediction.
  3. Prove confirmed recovery. Require a complete coherent history; a brief healthy reading or completed reanchor cannot clear a retained constraint.
  4. Reconcile token checks. Separate permission to issue a new credential from the independent checks on an existing credential.
  5. Accept the invocation guard. Prove that refusal occurs before work starts, and that admitted work has acknowledged evidence.
  6. Finish the saved process. Complete the migration order, accept the thread prescription and routing, then prove normal Gate Zero and the same-task return through the Response Table.

Current status: both selected tasks remain staged; the saved flow has zero runs. This checkpoint is a plan, with no live run or guard acceptance claimed.

Producer checkpoint · investigated 5 October 2026

Why the next step is source and configuration repair

The refresh routine ran, but retained all eight inputs. Its saved source setting and recent input evidence do not yet support an accepted measurement. The settings page also does not prove which configuration the running evaluator used.

Next: retain an assessment receipt for every outcome; bind the actual configuration and source revision; verify complete counter coverage; then review a controlled source transition and its acknowledged history.

After that: confirmed recovery, credential checks and the invocation guard, followed by the saved thread, Gate Zero and same-task Response Table return. Producer admission remains open. Both tasks are staged; the flow has zero runs.

Keep separate findings visible

Reducer identity, Function Table and registry-hash drift were found. The investigation has not established that this drift blocks the selected TAG child. It stays separate from the two execution-integration gaps.

The held parent’s reply is historical evidence. It does not complete this child. The NTF-23 prescription/JBD evidence report is closed and recorded on its integration SPOC. The earlier consolidated investigation report still awaits its separate feedback ACK.

Installed locally · verified 6 October 2026

Saved settings are confirmed by the live reader.

The approved local API restart is verified. The settings read now acknowledges the saved SST row; its values and writer details are unchanged. The chart still returns five stored measurements, and Drift Projection remains a forecast.

The reviewed source was checked against 510 file/package records before and after restart. The earlier 250 checks and full application build passed. Actual sampling production, complete writer and pressure coverage, a coherent source window and accepted recovery history still need evidence.

Open Governance Measures → Review the existing integration SPOC Review the producer evidence plan

Next: reconcile producer acknowledgments and pressure transitions, then verify the admitted measurement window and recovery lineage.

Source staged · verified 6 October 2026

Producer writes now report their outcome.

Seventeen counter call sites now wait for the write result. Six evidence branches distinguish a scheduled Flight Recorder write from its settled acknowledgment. Existing task verdicts and counter start/skip rules are preserved; the two writes remain separate.

Emergency close observations, canonical connection fields and the two topology-envelope readers are repaired. The combined source passes 230 checks, eleven syntax checks and required prebuild. The running API has not been restarted for these changes.

Next: reconcile the existing prior-state and tier commissioning records, then verify the measurement sample and sustained recovery. These repairs make failures observable; live producer, token and guard acceptance still need evidence.

Source staged · three contract reviews pending · 6 October 2026

The pressure-proof contracts are ready for review.

Done: the pressure relief and counter mapping repairs remain staged. Two further source repairs now reject incomplete or future FR samples and record the thresholds actually used by each drift score. The applied changes pass 126 focused source checks, syntax and prebuild; independent reviews pass. They have not been activated.

Read-only runtime configuration now agrees with the saved values exposed by the reader. A page of settings still cannot prove a particular score used them. The private receipt records that use; it remains evidence awaiting acceptance.

Adjacent pressure work: these reviews support the structural-relief and band-transition proofs; their proposed scheduling does not override this task’s accepted path.

Ready for BDD review: three pending rows on the existing integration carry the reason, evidence, effect and boundaries. The review packet was delivered through the canonical channel. No answer or acceptance has been recorded.

  1. Prior observation contract. The existing SST writer is documented. Accept or return the proposed structural payload, complete base/revision correspondence and projection/custody; verify its persistence through that existing path. The existing topology hash alone omits nested content.
  2. First proof scope. Accept or return a serialized attended sequence with an existing admitted prior row, independent settled readback before the next cycle and monotonic restore. Provisioning, overlap and production dedup remain separate.
  3. Actual score correspondence. Accept or return the selected gate score and its used formula, inputs, thresholds and confirmation window before prior-band storage and emission.
  4. Implement and prove the accepted contracts. Verify actual pressure/event/counter correspondence and restoration, then complete measurement and sustained recovery evidence.
  5. Keep the original operation separate. Its invocation, DDS/DDT, enforced prescription and routing still need acceptance. Pressure commissioning becomes a task prerequisite only through an accepted dependency or a relevant verified gate failure.

The same twenty pressure follow-ups remain the work records. Both source reports are closed. The three specification reviews remain pending in the Response Table. The human supplies screenshots.

Existing records and evidence basis
Staged child
00ebba45-c15a-4054-b0d4-26402476e350
Topology prerequisite
069d7374-bc01-42f2-9416-36bb38f685da
Tracking thread
8233dbe9-9cdf-4aff-923a-3b3fbc916ba8
Saved flow
ea3a735d-b56a-454d-8813-a47dff178651
Held parent
453bc52a-8ca8-4551-bb3b-7b6bce1c657d

Step order: Operations → Task Lifecycle Walkthrough. Status basis: TAG parallel investigation and saved-record readbacks, 4 October local time; saved integration advisory grade at 04:21:01 UTC and selected-record readback at 04:25:00 UTC on 5 October. Fourteen synthetic offline JBD authority checks pass; they do not establish live issuance or execution. At 04:42:30 UTC, actual preflight accepted three invalid isolated prescriptions; acceptance remains false. The three open integration actions were saved at 04:45:45 UTC. Nine measures in the saved flow are distinct from the twelve walkthrough steps.

Source repairs prepared · 6 October 2026

The source repairs have passed their checks.

Two agents prepared separate repairs. Their combined code now records which inputs and settings were used, checks whether settings were saved, and refuses a counter result when rows are missing. These source checks do not establish live acceptance.

Next: review local activation and prove the measurement source, complete history and retained recovery constraint. Then accept the invocation checks, finish the thread prescription and routing, and prove Gate Zero with the same-task return through the Response Table.

Current state: both selected tasks remain staged; the saved flow has zero runs. No new token or worker run was started.