The presentation follows the existing Operations journey, the Relay exchange and the Response Table. We use those records to establish unwired protocols, sequence governed work and review what returns. The engineering findings stay in the existing backlog; direct agent code repair is outside this session’s scope.
Start with the operation. Open Operations Home and the accepted integration SPOC. Show the purpose, governing references and saved thread.
Review the shared work record. Open the existing integration Response Table. Read the context, current and previous answers and linked To-Dos before drafting the next exchange. Resolve questions from canon before asking the human.
Continue the Relay exchange. Carry the same topic, thread and task references. Obtain and attach the Front Porch / Porch Pass in the sending browser before any Relay Desk compose send. Opening TAG Relay for review does not send or dispatch work.
Review the return. Return to the same Response Table. Keep draft, staged, sent, delivered and accepted states distinct. Save supported changes through the existing record and verify their readback; unresolved work remains open.
Story and captures: mobile introduction first: purpose → existing context → prescribed thread → governed exchange → inspectable return → governed improvement. Then move to wider application detail. The operator takes the screenshots. Describe the self-building process as the intended governed workflow; show actual recorded outcomes separately.
Backlog totals have not been counted here. Existing engineering work is preserved, and this walkthrough does not claim fresh task execution or automatic protocol installation.
Recorded exchange · 7 October 2026
Correction returned. Review preserves the limits.
The first verified Ollama Local / llama3.2 reply on TAG thread 8233dbe9 was request FR 298031 → response FR 298032. The returned wording invented terminology and missed the requested presentation beats. It is preserved as evidence and rejected for presentation guidance.
Latest correction: request FR 298079 → reply FR 298080 returned all six supplied presentation beats through Ollama Local, with one turn and forwarding off. The attended review is saved in the same SPOC and visible in the Response Table. The reply omitted the requested evidence sentence and labeled itself PROCESSING; its status does not prove task execution. Use the six supplied beats as an editorial draft with this caption: Supplied context only; dialogue transport demonstrated; no independent file/database access or actions claimed.
Open the actual reply in TAG Relay. Select the original thread beginning 8233dbe9, then inspect the recorded request and reply. Review the existing exchange without sending another message.
Open the integration Response Table. Expand Decision context. Its Current system state and Evidence summary show the attended review saved on the existing SPOC.
Tell the evidence story. The reply proves dialogue transport. The summary proves attended reconciliation. The raw dialogue did not automatically become a Response Table answer or a saved SPOC-discussion reply.
Discussion return remains open.
The attended review is saved in the existing SPOC context and visible in this Response Table. The integration request arrived through ClaudeDesk’s assembly channel. The current TAG discussion-reply route accepts TAG Relay requests, so it cannot save a discussion reply for this request. That connection remains governed follow-up; the walkthrough does not claim a saved discussion return.
The recorded TAG exchange uses thread 8233dbe9. The integration request’s separate discussion thread begins 25dae9b7. Keep those references together without treating them as the same thread.
The earlier supervised approval was recorded, but forwarding failed (FR 298028/298029). Preserve that attempt alongside the successful local retry. This exchange does not prove Gate Zero, JBD issuance, task completion or autonomous installation.
Engineering audit and existing backlog — retained for governed follow-up
The following audit records real findings. It does not assign direct code repair as the active presentation work.
Canonical correction · 7 October 2026
The governing process already exists. Verify its wiring.
The earlier request to design or approve the system’s foundational authority chain is withdrawn. Current system state, registered function identities, implementation bindings, thread composition, intent and mathematical checks, and token-bound authority already define the process. The Master Table joins and routes those governed threads within Temporal Cohesion Architecture.
Connect the existing checks. Trace the selected immutable prescription to its actual registered implementations and current system-state readers. Verify the required checks occur at the correct boundaries and refuse the right failure cases.
Verify this task’s existing route. Read the actual scope, routing node, registered OQS assembly and selected one-turn local worker through the canonical records. Missing task-specific bindings are implementation or record gaps; they do not ask the human to invent the authority model.
Finish sequencing and prove the return. Repair verified concurrency or stale-snapshot defects through the existing governed lifecycle. Then use normal Stage and Gate Zero for one attended run and verify its result, token, seals and accepted Response Table return.
The source audit identified an SST hash that can omit nested state, unconditional scope validation, missing or bypassed joint-verdict checks, permissive required-evidence paths and a stale promotion snapshot. Reconcile the instantaneous global wrapper floor with the existing CRS rules. Preserve the prescribed intent/math order and the ratified late-token sequence. Three source audits distinguish canonical requirements, current implementation and remaining evidence. Historical notes below preserve earlier conclusions; their requests for a new foundational ruling, speculative RuntimePAV ABI and universal legacy-owner adoption are superseded by this correction. No runtime activation or task execution is claimed by this review.
Earlier particular-decision proposal — superseded
The following is retained as history. Its new foundational approval and universal adoption requests are withdrawn.
Three attended reviews complete · 7 October 2026
The decisions are specific. The missing writers are identified.
Ready: OQS has a real active registration and the existing one-free-turn Ollama Local worker. The original archived assignment, April staging report and creation script establish the topology prerequisite’s history. The script supplied no owner UUIDs; current adoption must be recorded honestly.
Accept the real pre-action check. The prepared RuntimePAV contract supplies a real implementation, actual immutable step and same-child task, strict positive permit and the checkpoint immediately before normal worker dispatch. A side-lane degraded pass cannot satisfy it. BDD reviews this particular correspondence in the integration SPOC.
Adopt this operation’s OQS binding. Review only the existing OQS identity, its proposed witness, the three operational scopes and actual node/authority/caller relation. The existing local worker needs no new commissioning. Relay lane9 does not establish a governed permission lane.
Implement safe task sequencing. Prospective owner adoption and the native dependency need an atomic graph check. The independent review also found that a queued promotion can reuse a stale task payload. Require a reviewed snapshot reservation before the first Gate Zero or token effect; table locks alone do not solve that race.
The source/guide review does not install these missing writers or accept their authority. After specification and implementation acceptance: verify ordered invocation, save the immutable prescription, promote the original child normally, run one free attended turn and verify the genuine token, answer, seals and accepted Response Table return. These remain the same three managed actions.
Earlier source preparation and owner-review proposal — superseded in part
The source verification results below retain their bounded meaning. Requests for a new RuntimePAV authority decision and universal legacy custody adoption are withdrawn by the current canonical audit.
Original TAG operation · 7 October 2026
The claim and health source repairs are verified. The owner review is ready.
Applied in source: both primary paths now refuse worker dispatch if the one-turn database claim fails or its acknowledgment belongs to another task or turn. A genuine duplicate retains the existing continuation policy; an approved captured answer resumes without another model call. Twenty author, twenty independent and seventeen applied-source controls passed. Native prebuild passed. The API has not been restarted for this correction.
The prescription is now concrete: the review packet names nine ordered roles, three advisory graders, eighteen current registered identities, their actual inputs and outputs, and when each check belongs. NTF-23 and the graded integration remain accepted. RuntimePAV is a pre-action protocol with no matching native export; its name cannot substitute for an executable operation. The original accepted child still needs its real answer and both genuine seals.
The health source repair is applied: native samples now use the exact acknowledged current-inclusive window, and a retained critical anchor clears only through acknowledged sustained healthy recovery. Verified configuration changes can start a new coherent series. Stored payload, event identity, history acknowledgment and unavailable-read failures refuse invocation. Sixty-six actual-source controls and 387 affected regression checks passed; independent review passed twenty-three controls plus two storage-precision cases. Earlier failures and their corrections remain in the evidence. This is source verification; the API and live acceptance have not been activated.
The dependency editor remains held: the April source establishes original OQS assignment and explains the null UUID custody. Current adoption remains unaccepted. The row-only candidate permits concurrent cycles; a queued promotion can also reuse a stale payload. The reviewed transaction and snapshot-reservation design is conditional and unimplemented.
The three particular owner reviews
Admit the actual check bindings. Review the populated source, measure and phase correspondence in the existing integration SPOC, resolve the RuntimePAV implementation relation, and use the sanctioned immutable DDS/DDT/version carrier. Required failure policy is already settled.
Supply this task’s actual scope and route. Owner readback found the three selected operational scope records and both topology records absent. The registered OPB/OQS identity exists; it does not supply approved identity inputs, lane/caller authority or a routing witness. Preserve the stored Ollama Local selection: sequential, one free turn.
Establish legacy custody and a graph-atomic dependency. Review the existing prerequisite in Stage. Do not copy ownership from the child or apply the unsafe editor. Once the real association exists, use normal promotion for the original child.
OQS records and verifies this work on the original thread. BDD retains specification authority. After guards, immutable prescription and routing pass, the remaining proof is one attended worker result, its token and seals, then an accepted return to the task-owning SPOC and Response Table. Earlier progress sections below are historical.
Reviewed original contracts · 6 October 2026
Three actions. Six completion checkpoints.
OQS carries out this sequence on the existing records; BDD retains specification review. The selected check identity and integration grade are settled.
Connect the real invocation guards. Replace the CRS and selected-scope placeholders with actual health and trusted-caller checks. Reuse existing operational scopes and sanctioned writers.
Finish invocation acceptance in order. Prove the canonical refusal, witness, epoch/repeated-call, reconciliation and authorized reader cases for Pass 1A; then complete identity Pass 1B and governance Pass 1C. A separate production score-to-drift cohort join is not an automatic prerequisite.
Bind the saved thread’s prescription. Associate the actual immutable DDT/version and DDS requirements with this thread. Its nine OBSERVE steps currently have empty DDS bindings.
Enforce required checks through the primary path. A missing or failed required check must stop preflight or accepted execution. Preserve authentic task, thread and callee evidence in both primary callers.
Finish the existing route and dependency. Resolve this task’s scope → routing node → registered assembly → worker. Bind the existing topology request through the sanctioned native dependency path; preserve the free local worker selection.
Verify and accept the same-child return. Use normal Stage promotion, Gate Zero/JBD and one attended local turn. Verify the processing token, real result, A+B seals, terminal outcome and correlated accepted Response Table return.
Next work: use the current canonical audit to repair verified SST correspondence and required-check enforcement, then consume this task’s actual registered bindings, route and dependency through the existing governed process. Readiness snapshots, source controls and closed reports retain their narrower evidence meaning.
Current operation · source and record review · 6 October 2026
Finish the original task path.
The thread is saved and the NTF-23 identity choice is accepted. Complete invocation acceptance, then identity and governance migration; bind the actual DDS/DDT prescription; enforce it at normal preflight and primary processing; finish the existing routing and dependency before one bounded worker turn and its accepted return.
Scope correction: prior-state storage and the band emitter are separate pressure-proof work. Their pending review does not add a prerequisite to this task. Current health, authority, required gates and evidence still apply.
Worker readiness: the selected Ollama Local route uses the existing local MCP Relay on port 3100. Its health endpoint returned200 after the operator’s restart on 6 October. Registered routing, bounded worker pickup and accepted result evidence still need verification.
Source repaired · acceptance narrowed · 6 October 2026
Two defects repaired; finish the real checks.
Done: reviewed source now preserves accountable invocation refusals for thrown values and advances the real stored flow version. Source checks pass; live activation and acceptance remain open.
Already settled: NTF-23 applies to this thread, failed required checks stop traversal, and the task needs both seals. The missing prescription is the actual DDS and ordered DDT linked to this TAG scope version; the current composer drops supplied DDS bindings.
Next: finish the existing invocation acceptance catalog, author that prescription/version association and enforce its outcomes, then complete routing and selected Relay readiness before one attended local turn and its accepted Response Table return.
Relay: at 09:46 UTC, port 3100 refused and Docker was down. The old startup also starts other assemblies and a conversation watcher. Reconcile the actual service footprint before restoring it.
Version capture repaired · 6 October 2026
Keep the proposed checks when a version is edited.
Done in source: Operations now preserves the saved checks through edit, reorder and save. The API keeps them in the saved version and refuses a guarded snapshot before creating a flow. Review and source checks pass; live activation is still unverified.
Next: admit the actual TAG checks, their callable identities and ordered prescription on the existing integration. A known check name alone does not authorize it for a step. Then finish invocation acceptance, required Gate Zero outcomes, routing and Relay readiness before the attended turn and its Response Table return.
Ordinary page-only versions retain their existing path. A failed provenance stamp now reports failure and identifies any partial flow already created.
Checks mapped · two source corrections · 6 October 2026
Connect each required check to the task.
Done in source: Stage no longer offers a preflight bypass. The dual-seal check refuses missing task identities. Three attended reviews mapped the checks, the functions that perform them and the phase in which they belong. Independent checks and source regressions pass; API activation is still unverified.
Next: finish invocation acceptance, reconcile the specific function bindings, then save the required checks and their ordered version on this thread. Make a failed check stop the worker and require the actual answer and both seals before accepting its return.
The review uses the existing integration. NTF-23, required failure stops and both seals are already settled. The missing work is the exact binding and enforcement.
Invocation acceptance · 6 October 2026
Evidence must follow the actual task.
The invocation source now carries explicit task and journal IDs when its caller supplies them. It refuses unreadable correlation before the function runs. The change passed 104 regression tests and 29 independent review cases; live activation remains open.
The next proof joins the CRS and scope checks to verified authority, then checks epoch and replay, the durable reconciliation queue, independent ledger evidence and the separate reader. The test packet uses the existing records. It does not treat historical receipts or proposed bindings as an executed task.
CRS and scope admission · 6 October 2026
Confirm the authority before the task runs.
Three attended reviews traced the confirmation and scope checks to their existing records. We fixed a source defect that could report a Function Table update while writing a store its reader does not use. All 28 regression tests and 24 independent guard controls passed; live activation remains open.
Next, the existing SPOC must bind a complete confirmation and recovery window, the authenticated caller and operational scope, and the owner-verified Function Table identity correction. The Function Table safeguard is staged, and the plan for these remaining bindings is prepared. These bindings remain unaccepted, so the walkthrough does not claim that a task has run.
Confirmation evidence · 6 October 2026
Check the evidence before recovery.
The source repair prevents an incomplete or ambiguous history window, an invalid score, a failed evidence write or a changed configuration from starting recovery actions. It preserves valid drift records. All 140 regression tests and the two independent source reviews passed; live activation remains open.
Next, we must verify that the latest measurement and its history share the accepted configuration and source epoch, then establish sustained confirmation and recovery. The authenticated caller, operational scope and Function Table binding remain part of that review on the existing SPOC.
Particular bindings prepared · 6 October 2026
Review the evidence the checks will use.
Two attended reviews have prepared the exact measurement and recovery proposal, and the scope and owner proposal. The existing SPOC links the field matrices and the review procedure. BDD reviews the specification; OQS implements the accepted assignment.
The immediate invocation proof uses the migrated reduction scopes. The remaining inventory is deferred until an actual call needs it. The pressure-store and band-emitter reviews keep their separate scope; their answers do not authorize this task or correct the Function Table.
Next: review the particular fields on the existing form, verify the owner-controlled writer and caller correspondence, then finish invocation acceptance and this thread’s prescribed checks. Preparation and source checks do not establish live authority or an executed task.
The binding-review report is filed and journaled. The proposed fields are ready for BDD review on the existing SPOC.
Implementation sequence · 6 October 2026
One window. Verified recovery. An authorized caller.
The code now retains the exact calculated history row for inspection without causing a write. Its measured time, components and configuration stay together. The source controls passed; live admission is still open.
Both source reports are now filed and journaled. Next is the owner review of the existing measurement, recovery and scope bindings.
Accept the existing bindings. Record the actual measurement population, recovery recipe, scope records and trusted caller on the existing SPOC.
Build and prove the common window. Use the acknowledged current measurement plus the configured earlier members for the score, trend and confirmation fraction. Verify sustained recovery through the existing Restore cycle.
Verify scope, then complete the journey. Resolve the owner-controlled scope and Function Table bindings before invocation acceptance, the TAG prescription, normal preflight and the bounded local turn.
The original thread, routing prerequisite and same-child Response Table return remain the work record. Source preparation, accepted authority and execution each need their own evidence.
One bounded local turn, JBD authority and seals, accepted same-child return, then phone and wide captures.
What is already done
The existing thread/flow is saved and attached. The integration form and NTF-23 identity choice have the operator’s acceptance. The reducer migration and active consumers have source evidence; the later checkpoint below supersedes the earlier call-site inventory. Full invocation acceptance and the identity/governance passes remain open.
The September presentation folder supplies the story and recording guide. Its older views and local examples remain labelled separately from this child’s future run.
Reporting closed: ACK received, canonical report saved, FILE_WRITE 294717, one current-content crawler row and reporting ledger verified. The documented command-line crawler completed closure while the service was down. All three implementation actions remain open.
Installed locally · verified 5 October 2026
The repaired readers are active.
The CRS chart now returns stored measurements and declares their measurement-time source. Drift Projection identifies the history it uses and its sample window. Both selected tasks remain staged; the saved flow has zero runs.
Evidence still required: the newest stored measurement is from 3 October. The separate drift stream does not supply the missing recovery lineage. Forecast configuration and its token consumer still require their existing correspondence review. Reader activation does not establish confirmed recovery, guard acceptance or a task run.
Next: accept the producer, sampling and parameter revision, retained constraint and sustained recovery evidence before admitting the read-only invocation guard.
Investigation complete · implementation planned
What still separates this thread from a proved run?
Done: the readers are active. The measurement, forecast, recovery and token contracts have been traced through existing guides and records. Ten isolated checks reproduced the contract gaps; no live token or task changed.
Next, in order:
Trace each measurement. Establish its producer, time, rule revision and acknowledged history.
Align the forecast. Make the governed boundaries and their consumers agree. A prediction remains a prediction.
Prove confirmed recovery. Require a complete coherent history; a brief healthy reading or completed reanchor cannot clear a retained constraint.
Reconcile token checks. Separate permission to issue a new credential from the independent checks on an existing credential.
Accept the invocation guard. Prove that refusal occurs before work starts, and that admitted work has acknowledged evidence.
Finish the saved process. Complete the migration order, accept the thread prescription and routing, then prove normal Gate Zero and the same-task return through the Response Table.
Current status: both selected tasks remain staged; the saved flow has zero runs. This checkpoint is a plan, with no live run or guard acceptance claimed.
Producer checkpoint · investigated 5 October 2026
Why the next step is source and configuration repair
The refresh routine ran, but retained all eight inputs. Its saved source setting and recent input evidence do not yet support an accepted measurement. The settings page also does not prove which configuration the running evaluator used.
Next: retain an assessment receipt for every outcome; bind the actual configuration and source revision; verify complete counter coverage; then review a controlled source transition and its acknowledged history.
After that: confirmed recovery, credential checks and the invocation guard, followed by the saved thread, Gate Zero and same-task Response Table return. Producer admission remains open. Both tasks are staged; the flow has zero runs.
Current investigation / existing integration
Confirm the governance state before admission.
Done: the existing governed-parameter read is verified. Additional history and corridor readers were inspected, and five isolated source probes reproduced confirmation problems. Those readers do not establish sustained recovery. The planning report is archived; its Flight Recorder event, matching journal entry and existing integration ledger are verified. Implementation acceptance remains open. The filed-source review now separates confirmed governance state, credential issuance and current token validity; the remaining implementation dependencies are recorded in the same integration.
Next: accept the sample and transition contract; retain a confirmed constraint through brief recovery; preserve sample and parameter provenance; implement the read-only admission guard. The full invocation migration, prescription, routing and same-child return remain open.
Use the same integration record and Response Table to review this work. These links open pages; they do not send answers, promote tasks or execute a worker.
Admission rehearsal: isolated tests confirmed that enforcement remains unfinished. The acceptance checklist now maps refusal, sustained recovery and evidence to existing records. These fixtures do not prove a live run.
Current source checkpoint
Recent history, visible failures.
Done: the projection reader selects the most recent bounded window, then calculates in chronological order. It exposes the selected source and first/last sample times. Failed or invalid reads return unavailable; successful-empty remains distinct. Separate partial streams and Gate Zero pass rate cannot manufacture a CRS window.
Checked: 34 new isolated cases; 46 tests across two files, three syntax checks and required prebuild guards pass. The same complete window retains its original mathematics and thresholds. The existing token consumer receives no projection after a failed read in the isolated test. Local reader activation is verified; confirmed recovery remains unverified.
Boundary found: legacy threshold names resolve to zero. The forecast also feeds a token-death chain. Threshold correction therefore needs the existing BDD correspondence against independent token validity; a display repair cannot silently become token policy. This frame preserves that code and tuning. Forecast metadata is not a confirmed-state guard.
Next: use the now-verified catalog to review the newest coherent samples; accept producer, parameter revision, retained constraint and sustained recovery correspondence; reconcile the token consumer; then implement and prove the read-only invocation guard. Continue full Pass 1A → 1B → 1C, the accepted DDS/DDT thread, NTF-23 and routing before one same-child return. Both requests are staged; zero flow runs.
Reporting: Canonical source-report closure is verified.
Current source checkpoint
The remaining reducer callers are migrated.
Done: 31 direct calls in environment reduction, pair-map differentiation, gate processing, Jekyll population and 2VP proof now await the existing registered path. Active Function Table, registrar, task-creation and verification consumers await their result. Fresh binding and acknowledged evidence precede the accepted composite output or downstream coordinate/health write. The original values, versions, hashes and dependency order are preserved.
Checked: 49 new isolated cases; 280 tests across fifteen files, sixteen syntax checks and required prebuild guards pass. The registrar uses real structural differentiation in these fixtures. Task-creation and verifier seams are tested; these checks do not execute the whole task pipeline. The six numerical proof functions match their retained originals across 463 ordered fixture receipts; those loops do not satisfy the separate governed stress or 100-run acceptance experiment.
Inventory: 58 static sites migrated cumulatively; zero remaining direct calls in the bounded API audit. Tests, generated sources and scripts are excluded; no exhaustive dynamic repository graph is claimed.
Still open: full Pass 1A authority/guard, durable queue, JBD, stress and independent-ledger acceptance; then Pass 1B → 1C, governing DDS/DDT, NTF-23 enforcement, accepted routing and the same-child return. Source activation is unverified. Nine historical packet source/pin failures remain separately retained; no fingerprints were rewritten. Both selected tasks remain staged and the saved flow has zero runs.
Reporting: Canonical report closure is verified.
Verify the stored history.
Done: the latest five recorded scores match their recorded components and weights. Two existing history readers now preserve errors instead of hiding them as empty history. Twelve focused source checks and required prebuild guards pass. The running API has not been verified against this revision.
Catalog verified: the operator opened the Control Plane table in Bot Admin. All fourteen displayed columns were read: measured_at and created_at exist; recorded_at does not. The chart now uses measured_at in its source. Two new regressions and all 48 focused history/projection tests pass. The displayed first-page rows are historical examples; they do not establish a current recovery window. The machine catalog boundary remains unchanged.
Still open: admit the newest coherent sample window, parameter revision and recovery lineage; then wire the confirmed-state admission guard. Both selected tasks remain staged and the saved flow has zero runs.
The earlier planning report is closed. The reader-repair STAGED report is now closed after operator ACK: its canonical file, Flight Recorder event, matching journal entry and existing reporting ledger are verified. Local reader activation is verified; guard acceptance remains open.
Done: five primitive calls inside the function and assembly reducers now await the registered path. The same supplied client travels outside measured payload, stays separate across concurrent invocations and expires when its callee settles. The local batch, form grader and registrar function-health call are migrated too; the existing parity diagnostic now uses the isolated registered tests. All child receipts precede the accepted parent result; nested failure withholds coordinates and registrar writes.
Checked: 43 new isolated cases; 223 tests pass across eleven files. Full outputs match retained before-source baselines; syntax and required prebuild guards pass. The broader historical Phase-8 packet suite has nine failing stale-source/pin checks, retained separately; its fingerprints were preserved.
Remaining: 31 static calls in five API modules. The registrar structural pair-map path depends on that remaining migration. Finish and accept Pass 1A before Pass 1B → 1C, then the confirmed CRS guard, DDS/DDT, NTF-23/routing and same-child return. Source activation and live execution are unverified.
Reporting: Canonical report closure is verified.
Earlier source checkpoint
Layout, view and coordinate verification.
Done: five calls in three modules now await the existing registered invocation path and its evidence receipts. Complete outputs match retained before-source baselines. Binding refusal or missing evidence prevents coordinate writes or response release. Existing seed and force-seed holds remain.
Checked: 35 new isolated tests; 157 pass across seven test files. Syntax and required prebuild guards pass. This verifies source behavior; activation and accepted execution remain unverified.
Remaining within the migration package: 36 static calls in seven API modules, one separate local batch call and the active registrar dependency. The completed inventory is 22 static sites plus one dynamic site. Complete and accept Pass 1A before identity and governance passes. The existing three implementation actions remain open.
Reporting: The canonical STAGED report and closure are verified.
Earlier source safeguards
Source STAGED: each invocation reads its registry binding afresh, distinguishes a failed read from an absent identity and checks a supplied architectural-layer assertion before execution. Required hashes remain computed with witness:false; hashing failures retain an accurate execution state. Missing or malformed success evidence receipts now hold the executed result with WITNESS_INCOMPLETE. Both hashes and the execution flag survive; there is no automatic retry.
Verified: 108 focused fixture checks, JavaScript syntax and required prebuild guards pass. A 100-refusal fixture records correlated mocked drift/refusal events, executes no callee and accepts a corrected binding. These are source checks; full Pass 1A and durable queue acceptance remain open. The consolidated safeguards report is closed after operator ACK: canonical report, FILE_WRITE 294813, one current-content crawler row and the existing reporting ledger are verified. All three implementation actions remain open.
Next foundation dependency: establish the admitted reader for confirmed CRS state and sustained recovery. The current health reader computes a single score and permits a successful reanchor; the invocation contract requires confirmed CRITICAL refusal. Existing drift snapshots and tunable variables must be reconciled through BDD before wiring this check. No threshold or live policy was changed.
Responsibility: the human takes screenshots. OQS supplies code, guide and summaries. Live task execution waits for accepted prerequisites.
Showing all 10 work packages.
1Shared foundation
Governed function invocation
Some common checks currently return PASS without evaluating authority, health or applicable data constraints.
Connect the existing checks and accountable pre/post witnesses. Handle partial failure, stale state, timeout and repeated calls.
OQS builds · BDD verifies
What finishes this package
Acceptance: Denied calls execute no function. Missing required evidence cannot release an accepted result.
Rollback / hold: Restore only the reviewed source changes; preserve all failure evidence.
The bounded API inventory is migrated: 58 static sites, zero remaining direct calls. Awaited active consumers are source verified. Full invocation acceptance, activation and later identity/governance bindings remain open.
Accept full Pass 1A evidence and activation before identity Pass 1B and governance Pass 1C. Preserve the historical packet; resolve current binding/export correspondence through the existing records.
OQS builds · existing record owners accept
What finishes this package
Acceptance: No in-scope bare calls or recursion; unchanged authorized outputs; full Pass 1A → 1B → 1C evidence.
Rollback / hold: Restore only scoped changes and approved binding before-values. Never reset an issued token.
Accepted correspondence and both entry routes are missing; current routing stores are empty.
Complete the task-specific accepted assembly/node correspondence on the existing routing prerequisite. Use the owner topology editor and verify both routing readers; retain the broader scope inventory as supporting evidence.
Existing topology prerequisite · BDD verifies
What finishes this package
Acceptance: The saved policy maps this task to registered nodes/assemblies. A coordinate or friendly label cannot substitute for identity.
Rollback / hold: Preserve the full prior topology and face policies. No wildcard seed to force success.
The original assignment and staging script establish OQS provenance. Prospective owner adoption and native dependency remain unaccepted.
Implement the accepted transaction and promotion snapshot reservation; prove concurrent cycles and queued stale promotion refuse. Keep the unsafe row-only candidate held.
OQS owner editor · reviewed legacy authority
What finishes this package
Acceptance: The exact predecessor resolves; self/cycle/stale/unauthorized links refuse. No duplicate task or inferred authority.
Rollback / hold: Restore only changed relationship fields through the accepted writer.
This staged child has no actual accepted run or correlated result/return yet.
After all prerequisites, promote normally and use the returned task ID. Prove the route, one proposal, processing token, reverify, required seals, result and ledger pair.
Attended OQS · BDD/owner acceptance
What finishes this package
Acceptance: The same lineage returns an accepted result to its governing SPOC/Response Table. Preserve produce → token → reverify.
Rollback / hold: A failure or ambiguous turn stays held. No parent reset, replay or re-tokenization.
Existing images are historical, illustrative or local snapshots; they do not prove the new run.
Use the supplied checkpoint guide when the servers return. The human captures the phone opening and wide detail; OQS keeps steps, code and evidence summaries current.
Human takes screenshots · OQS supplies code, guide and summaries
What finishes this package
Acceptance: Every observation has its record/event/time/source and mode. New public images receive individual review.
Rollback / hold: Keep originals and prior manifests; retain public:false for unreviewed images.
“Find the guidance → record the process → review the boundary → stop when required evidence is missing → inspect the accepted result.” Use the same mobile post images at the start of the video, then move to wider detail.
Normal promotion prepares the task for processing. Current source retains the accepted produce → processing token → reverify order. A model proposal is provisional; it does not establish authority, completion or accepted return.
Required checks must be consumed by the primary task path. An observed flow, a green advisory grade, a historical reply or a report ACK cannot replace that evidence.
After promotion, use the returned task ID in Live and Task Lineage. The staged request ID and promoted task ID are distinct.
Installed locally · verified 6 October 2026
Saved settings are confirmed by the live reader.
The approved local API restart is verified. The settings read now acknowledges the saved SST row; its values and writer details are unchanged. The chart still returns five stored measurements, and Drift Projection remains a forecast.
The reviewed source was checked against 510 file/package records before and after restart. The earlier 250 checks and full application build passed. Actual sampling production, complete writer and pressure coverage, a coherent source window and accepted recovery history still need evidence.
Next: reconcile producer acknowledgments and pressure transitions, then verify the admitted measurement window and recovery lineage.
Source staged · verified 6 October 2026
Producer writes now report their outcome.
Seventeen counter call sites now wait for the write result. Six evidence branches distinguish a scheduled Flight Recorder write from its settled acknowledgment. Existing task verdicts and counter start/skip rules are preserved; the two writes remain separate.
Emergency close observations, canonical connection fields and the two topology-envelope readers are repaired. The combined source passes 230 checks, eleven syntax checks and required prebuild. The running API has not been restarted for these changes.
Next: reconcile the existing prior-state and tier commissioning records, then verify the measurement sample and sustained recovery. These repairs make failures observable; live producer, token and guard acceptance still need evidence.
Source staged · three contract reviews pending · 6 October 2026
The pressure-proof contracts are ready for review.
Done: the pressure relief and counter mapping repairs remain staged. Two further source repairs now reject incomplete or future FR samples and record the thresholds actually used by each drift score. The applied changes pass 126 focused source checks, syntax and prebuild; independent reviews pass. They have not been activated.
Read-only runtime configuration now agrees with the saved values exposed by the reader. A page of settings still cannot prove a particular score used them. The private receipt records that use; it remains evidence awaiting acceptance.
Adjacent pressure work: these reviews support the structural-relief and band-transition proofs; their proposed scheduling does not override this task’s accepted path.
Ready for BDD review: three pending rows on the existing integration carry the reason, evidence, effect and boundaries. The review packet was delivered through the canonical channel. No answer or acceptance has been recorded.
Prior observation contract. The existing SST writer is documented. Accept or return the proposed structural payload, complete base/revision correspondence and projection/custody; verify its persistence through that existing path. The existing topology hash alone omits nested content.
First proof scope. Accept or return a serialized attended sequence with an existing admitted prior row, independent settled readback before the next cycle and monotonic restore. Provisioning, overlap and production dedup remain separate.
Actual score correspondence. Accept or return the selected gate score and its used formula, inputs, thresholds and confirmation window before prior-band storage and emission.
Implement and prove the accepted contracts. Verify actual pressure/event/counter correspondence and restoration, then complete measurement and sustained recovery evidence.
Keep the original operation separate. Its invocation, DDS/DDT, enforced prescription and routing still need acceptance. Pressure commissioning becomes a task prerequisite only through an accepted dependency or a relevant verified gate failure.
The same twenty pressure follow-ups remain the work records. Both source reports are closed. The three specification reviews remain pending in the Response Table. The human supplies screenshots.
Source repairs prepared · 6 October 2026
The source repairs have passed their checks.
Two agents prepared separate repairs. Their combined code now records which inputs and settings were used, checks whether settings were saved, and refuses a counter result when rows are missing. These source checks do not establish live acceptance.
Next: review local activation and prove the measurement source, complete history and retained recovery constraint. Then accept the invocation checks, finish the thread prescription and routing, and prove Gate Zero with the same-task return through the Response Table.
Current state: both selected tasks remain staged; the saved flow has zero runs. No new token or worker run was started.